
US$19
Prix de référence
50 pièce
20 jours de délai
Découverte de produits pour les acheteurs professionnels
Image 1 sur 10Cliquez pour agrandir
Demande B2B
Prix de référence
US$69/ pièce
20 pièce · Commande minimum
Tarifs dégressifs
Demandez un devis selon votre quantité et vos spécifications.
【Usage】Provides continuous personal cooling for workers in high-temperature positions of 35–60°C in metallurgy, foundry, power, and chemical industries, reducing the risk of heat stress and heatstroke. Also suitable for prolonged sun exposure scenarios such as outdoor duty, road construction, and scenic area patrols.
【Material】The vest is made of eco-friendly waterproof and breathable polyester fabric with a mesh structure for sweat-wicking and breathability. Anti-static, flame-retardant, and UV-resistant fabrics are available upon request. Built in with 4 independently encapsulated composite phase change material (PCM) cooling modules, non-toxic and harmless, passing SGS safety and environmental testing.
【Specifications】Model U4M-VEST; phase change temperature 22°C (cool version) / 25°C (fresh version); runtime 2–5 hours at 35°C ambient temperature; total weight approx. 0.99kg; cycle life over 5,000 times; one-size-fits-all design with adjustable shoulder straps and waist circumference; cooling modules warranted for 1 year, recommended service life 3 years.
【Applications】Steelmaking and ironmaking, casting and forging, boiler and steam turbine inspection, injection molding and die casting, chemical and petroleum refining, printing and dyeing and food processing workshops, as well as outdoor high-temperature operations such as traffic police, road administration, sanitation, and express delivery.
【Features】Cool without being icy; cooling energy concentrated on the body's core cooling zones to protect the heart and lungs; cooling requires only 1–2 hours of refrigeration or cold water soaking, no electricity or water filling needed; weighs less than half of comparable international products; can be worn as inner or outer layer; no restriction during running, bending, or climbing; modules cycle over 5,000 times, with a cost of less than 0.1 yuan per use.










| Méthode | Délai de transit | Base de calcul |
|---|---|---|
| Sea freight | 25-35 days to major destination ports | FOB / CIF, freight quoted by forwarder |
| Air freight | 7-10 days airport to airport | Charged by chargeable weight |
| Express (DHL / FedEx / UPS) | 3-7 days door to door | Best for samples and trial orders |
Our MOQ is 20 pcs per item. Trial orders below MOQ can be arranged for stock items.
Confirmez la quantité, la destination de livraison, les frais d'expédition et les conditions de paiement avec le fournisseur avant de commander.
Les documents de certification ne sont pas publiés pour cet article. Demandez au fournisseur le certificat ou le rapport d'essai dont vous avez besoin.
Indiquez votre quantité, les spécifications requises et la destination pour obtenir une réponse plus utile.

US$19
Prix de référence
50 pièce
20 jours de délai

US$129
Prix de référence
20 pièce
25 jours de délai

US$59
Prix de référence
20 pièce
25 jours de délai

US$72
Prix de référence
20 pièce
25 jours de délai
US$69